Renovation of the facade of the Shafi’i building on Elkhebal St

Image

This building is from the end of the first Pahlavi period, which was not very beautiful due to the lack of care and periodic repairs. This building is located in Tehran, Elkhebal St., after Vila St. and next to Dana Insurance. Among the measures taken, we can mention the replacement of doors and windows, stone work, cleaning the facade with an industrial steam washing system, replacing bricks, and finally implementing a protective coating. In addition, some commercial equipment such as shutters and signs were also replaced.

Tehran city beautification organization

Implementation date 1395

Company members

Avatar

Omid khedameh Ammarzaei

Managing Director and Chairman of the Board of Directors Avatar

Saeed Mahmoud Kalaye

Manager of the restoration group Avatar

Amir Asadi

Director of Architecture Department

Preparation of the restoration plan for the historical bath of Dezashib

Image

Dezashib bath is one of the very old baths, the historical Dezashib bath (Garmaba Buali). The construction date of this building goes back to the Safavid period, which is the booming period in the construction of baths. The architectural style and construction method of the building confirm this. Due to the great age of this bath, the name of its founder and original owner is not known. It is likely that this bath was built by one of the elders and nobles living in this neighborhood. Dezashib historical bath on Reza Kabiri St. Karimi is located in the southern corner of Kuche Alavi. In addition to their main role in hygiene and cleanliness, traditional baths have also been the place of many rituals, traditions and rituals.

Darko Holding

Implementation date 1395 - 1396

Company members

Avatar

Omid khedmeh emam rezaei

Managing Director and Chairman of the Board of Directors Avatar

Saeed Mahmoud Kalaye

Manager of the restoration group Avatar

Amir Asadi

Director of Architecture Department

Renovation of the Jordan building of Mandegh Alborz High School

Renovation of the Jordan building of Mandegh Alborz High School

Picture42
Picture41
Picture40
Picture39
Picture38
Picture37
Picture36
قبلی بعدی The employer General Administration of Tehran Schools Renovation Implementation date 1399-1400

In 1301, American College or Alborz College was established in the current location and in 1319, it was renamed as Alborz High School. The Jordan building, the residence of Dr. Jordan, the founder of the college, and then Dr. Mojtahdi, the manager of the high school, has been abandoned in recent decades. Abandoned, this building is built on two floors below the ground floor and in 2019 it was decided to restore it and turn it into a museum.

Restoration of the first and second phases of Mozaffari Palace in Oshan

Documenting and restoration plan for the tilework of the rack dome of Azadi Tower

Picture25
Picture24
Picture23
Picture22
Picture21
Picture20
Picture19
Picture18
Picture17
Picture16
Picture15
Picture14
Picture13
Picture12
Picture11
Picture10
قبلی بعدی The employer Municipality of Oshan, Fashm and Migun Implementation date 1397-98

Mozafari Oshan Palace belongs to the Qajar period and is located in the Rudbar Qasran region of Shemiranat city. This historical work was registered as one of the national works of Iran on October 1, 2002 with registration number 10390.

The structure of the extroverted building has been built, and around it, on the first and second floors, a porch has been considered, with square and round columns next to each other to bear the load of the floors.

The second floor of the building has round columns, the main foundation of which is made of wood and covered with plaster. These columns are installed in threes in the four corners and have stucco decorations on the heads of the columns.

In the eastern and western fronts of the building, two entrance doors are installed in the shape of a semi-circle and its curve is towards the outside. The height of the floor of the porch and the first floor from the yard around the building is about 120 cm. After passing 5 steps, you enter the porch of the first floor and then a corridor that extends in the east-west direction.

Following the blocking of the western entrance door of the building during the renovation of recent years, a connecting staircase to the second floor was built from the end of the middle corridor on the west side of the building, and after reaching the foot of the middle floor, the staircase turned into two branches, right and left, and from both You can get to the second floor.

On the second floor of the building, there is a general room on the south side and two rooms on the north side.

The main materials used in the building are brick, plaster mortar, mud and wood.

Preparing maps of the current situation and revitalizing the former house of Parvin Etsami

Preparing maps of the current situation and revitalizing the former house of Parvin Etesami in Tehran (West Block)

Picture29
Picture28
Picture27
Picture26
قبلی بعدی The employer Private sector Implementation date 1398

The historical house of Parvin Etisami, which according to local statistics is more than eighty years old, is located in the neighborhood of the old mosque of Abdul Nabi Nouri. This building is important from a historical-cultural point of view and reminds of the architecture of the late Qajar period (integrated architecture) where we see the influence of Western neoclassical architecture in the traditional architecture left over from the Safavid era. This house was divided into three parts over time. Its eastern part is owned by ICOMOS (International Council of Buildings and Historical Sites) and the central part of this building was registered in the list of national monuments under number 14619 in the summer of 2014. Documenting and preparing the revitalization plan of the western part was also included in the agenda of this company and it was completed.

ENG-Restoration and revitalization plan as well as supervision of the restoration of the Noble City Institute building

Restoration and revitalization plan as well as building restoration supervision. Noble City Institute

Image The employer Dr. Abdulahi Implementation date خرداد 1401
هدیش پارس خبر 0

Organizing and improving the grounds and graves of Imamzade Abdullah Shahrari

Organizing and improving the grounds and graves of Imamzade Abdullah Shahri

Image The employer Behesht Zahra Organization Implementation date 1400

-ENGمرمت چهار گنبد کاروانسرای سنگی امام

Restoration of the four domes of Yengi Imam Caravanserai

Picture47
Picture46
Picture45
Picture44
Picture43
قبلی بعدی The employer UNESCO regional office in Tehran Implementation date 1399

This caravanserai is located in the city of Hashtgerd. According to historical sources, this caravanserai is a work of the Safavid period, which was changed in later periods and turned into a unique combination of guest house and garden.

This caravanserai has four porches and is made of brick.

The first phase of the restoration of the former building of the Egyptian Embassy (Sanei House)

The first phase of the restoration of the former building of the Egyptian Embassy (Sanei House)

Picture1
the employer Tehran city beautification organization Implementation date 1395

First they said that the house belongs to Kashif al-Sultaneh (the father of Iranian tea), after rejecting this assumption and finding new documents about the house, they considered the mansion attributed to him to be something similar to the house of "Mohsen Moghadam" whose owners (Manochehar and Hoshang Sanei) through Their interest had bought different old decorations and installed them in different parts of the house. The exquisite tiling and accessories of this house have been looted over time, so that in the near future, it will be destroyed by the owner of the building. A house that was rented by the office of the protector of Egyptian interests in Iran before the Egyptian revolution, but after the Egyptian revolution, this building was evacuated and abandoned. At this stage, the operation of removing extensions and emergency restoration was carried out.

Get the catalog of our projects here